 |
Speedy completion. Modular construction can be up to 50% faster than traditional build
|
 |
Lower cost. Generally more cost effective than traditional build. |
 |
More dependable build programme. Factory built modules are not affected by bad weather conditions or other unforeseen variables on site. Foundations and main structure are prepared simultaneously. Short delivery window, then finishing work is completed inside the building. |
 |
Quality product. Factory built to strict tolerances and quality control standards. Wernick Buildings has ISO 9001 accreditation. |
 |
Full project management. Includes design service, planning applications and building regulation applications. |
 |
Sustainable form of building. Considerably less waste than traditional methods. Minimum disruption and noise on site. |
 |
RapidplanT 3000 galvanized steel frame for long life and permanence. |
 |
Buildings can be finished with a brick skin or other cladding system, which together with a pitched tiled roof gives an attractive 'traditional' appearance. |
 |
British company founded in 1933. Six divisional sales offices nationwide. |
 |
Wernick Buildings has all necessary industry body memberships and approvals in place |